2nd loop

Zak at workAlways working on more track 🙂

Gravel being loaded

 

 

 

 

 

working on track 2015Gravel being spread on the track.

 

 

 

 

 

 

 

 

TrackFinished piece of track.
 

 

 

 

Now there are two loops. The train ride is with the addition of the second loop about 1 mile long and of course, more is being built. We need to build a tunnel next so we can extend the track to a third area of the property. It’s all a matter of money and time 😉